中式园林中亭子的施工要注意什么?

来源:http://www.huiyunsheji.com/ 日期:2019-10-16 发布人:admin浏览次数:
  施工前应准备好任何项目,以确保施工顺利。 让我们看一下在建造景观亭之前应注意的事项:
  Any project should be prepared before construction to ensure smooth construction. Let's take a look at the precautions before building the landscape pavilion:
  1.物流和施工准备。
  1. Logistics and construction preparation.
  2.设计师有时会忽略向业主和施工现场提交景观凉亭艺术品和技能要求的关键步骤。 一方面,图纸审查可以优化计划,节省施工成本,降低施工难度。 另一方面,施工人员可以快速了解施工要求和景观标准,弄清施工的重点和难点,减少因施工量不足造成的返工。  。
  2. The designer sometimes ignores the key steps to submit the landscape pavilion artwork and skill requirements to the owner and the construction site. On the one hand, drawing review can optimize the plan, save construction cost and reduce construction difficulty. On the other hand, the construction personnel can quickly understand the construction requirements and landscape standards, clarify the key points and difficulties of construction, and reduce the rework caused by insufficient construction.
  3.施工过程划分和材料统计
  3. Construction process division and material statistics
  在景观亭的施工分析中,施工过程很清楚,从何处开始施工,每个部分的施工过程均按照固定的常规格式进行。 当然,我们不应该删除不熟悉的节点项目,而应该将它们分开或集中。 计算订单处理的到达时间并考虑假期。 对于不同的自定义设置,应备份容易磨损的材料,以便以后进行维护。
  In the construction analysis of the landscape pavilion, the construction process is very clear. Where to start the construction? The construction process of each part is carried out according to the fixed conventional format. Of course, we should not delete unfamiliar node items, but separate or centralize them. Calculate the arrival time of the order processing and consider the holidays. For different custom settings, you should back up materials that are easy to wear for later maintenance.
  4,手工组织计划
  4. Manual organization plan
山东中式园林设计装修
  从理论上讲,景观亭的竣工日期减去开工日期为总工期。 但是,由于跨站施工和恶劣天气的影响,甲方的工程建设周期滞后及其他不可预见的因素,项目的竣工日期由甲方根据自己的估计或提前假期确定。
  Theoretically, the completion date of the pavilion minus the commencement date is the total construction period. However, due to the influence of cross station construction and bad weather, Party A's project construction cycle lags behind and other unforeseen factors, the completion date of the project shall be determined by Party A according to its own estimation or early leave.
  要按时完成工作并不容易,但始终要努力做到。 更好的方法是增加白天和黑夜工作的人数。 在淡季,您可以在旺季打电话给某人并提前预订。 因此,对手工作业的需求计划应该越准确,精确度就需要依靠丰富的工程实践经验和计算能力。
  It's not easy to finish the work on time, but always try to do it. A better way is to increase the number of people working day and night. In the off-season, you can call someone in the peak season and book in advance. Therefore, the more accurate the demand plan for manual work is, the more accurate it is, the more practical engineering experience and calculation ability are needed.
  以上是景观亭建设前应注意的事项。 希望对您有所帮助。 如果您对此信息感兴趣,请继续关注我们的网站。 展馆的建设过程将在稍后进行,敬请期待!
  The above are precautions before the construction of landscape pavilion. I hope it will help you. If you are interested in this information, please continue to follow our website. The construction process of the exhibition hall will be carried out later, please look forward to!