景观园林装修怎么保证施工工期?

来源:http://www.huiyunsheji.com/ 日期:2019-10-11 发布人:admin浏览次数:
  在项目建设中,我们将根据设计文件和有关施工规范和规定,精心设计施工组织的实施情况,确定合理的施工方案,科学规划,狠抓重点,突出重点。 身体。 同时,我们将把握全局,制定总体计划并进行科学管理,以确保项目的质量和数量按时完成。 我们将从以下几个方面提供有利的保证:
  In the construction of the project, we will carefully design the implementation of the construction organization according to the design documents and relevant construction norms and regulations, determine the reasonable construction plan, make scientific planning, pay close attention to the key points and highlight the key points. Body. At the same time, we will grasp the overall situation, formulate the overall plan and carry out scientific management to ensure that the quality and quantity of the project are completed on time. We will provide favorable guarantees from the following aspects:
  (1)优化施工方案保证
  (1) Guarantee of optimizing construction scheme
  有序,有层次地安排施工是确保工程进度和工程质量的关键环节。
  Arrangement of construction in an orderly and hierarchical manner is the key link to ensure the progress and quality of the project.
  1.分阶段并行施工,掌握每个施工过程的交叉点,合理安排,突破。
  1. Concurrent construction in stages, grasp the intersection of each construction process, arrange reasonably and make breakthroughs.
  2.科学管理,优化施工组织,把握关键流程,并按照地形整理,绿化植树,土建铺面,场地围护等专业分工组织施工。
  2. Scientific management, optimization of construction organization, grasp the key process, and organize construction according to the professional division of work, such as topographic arrangement, greening, tree planting, civil pavement, site enclosure, etc.
  3.如有必要,昼夜工作,并实施轮班工作。
  3. Work around the clock and shift work if necessary.
  (2)组织结构和资源配置的保证
  (2) Guarantee of organizational structure and resource allocation
  1.派遣精英,加强项目管理。 中标后,应按项目特点准时确定各级人员,并确定专业的施工队伍; 性能优良的工程机械设备应按时投入使用,并应及时进行安装调试,以保证按时施工。 同时,将及时分配项目所需资金,以确保项目的顺利进行。 项目经理部按照项目经理的要求进行工作,加强项目管理,并在整个施工过程中加强监督,检查和指导。 并选择了建筑材料以提高项目质量,降低施工难度并避免返工。
  1. Dispatch elites and strengthen project management. After winning the bid, the personnel at all levels should be determined on time according to the characteristics of the project and the professional construction team should be determined; the engineering machinery and equipment with excellent performance should be put into use on time, and the installation and debugging should be carried out in time to ensure the construction on time. At the same time, the funds required for the project will be allocated in time to ensure the smooth progress of the project. The project manager department carries on the work according to the request of the project manager, strengthens the project management, and strengthens the supervision, inspection and guidance in the whole construction process. The construction materials are selected to improve the quality of the project, reduce the difficulty of construction and avoid rework.
  2.为了确保计划的完成,我公司将选择曾担任过类似项目的项目经理来负责该项目。 该同志在现场施工组织管理方面具有丰富的经验,可以合理地规划和安排,以确保在规定的时间内完成项目建设工期。  。
  2. In order to ensure the completion of the plan, our company will select a project manager who has worked on similar projects to take charge of the project. The comrade has rich experience in the field construction organization and management, and can plan and arrange reasonably to ensure that the construction period of the project is completed within the prescribed time.
山东景观园林设计装修
  3.制定详细的物料采购计划,以确保及时提供物料,成立物料供应小组,专门从事物料采购,并严格按照总体施工进度表中规定的时间将物料运送到现场。
  3. Develop a detailed material procurement plan to ensure timely delivery of materials, set up a material supply team specializing in material procurement, and deliver materials to the site in strict accordance with the time specified in the overall construction schedule.
  (3)施工计划保证
  (3) Assurance of construction plan
  1.进行总体规划,以确保施工计划的严肃性。
  1. Make overall planning to ensure the seriousness of the construction plan.
  2.密切关注项目进度,并确保其按计划完成。
  2. Keep a close watch on the progress of the project and ensure that it is completed as planned.
  3,加强物资的采购,运输,储存和供应,确保项目需求,坚决制止物资等待现象。
  3. Strengthen the procurement, transportation, storage and supply of materials, ensure project demand and resolutely stop material waiting.
  4.严格按照施工期网络计划的施工进度,结合各项技术措施计划,认真编制施工进度,加强施工组织和领导,严格按照批准的施工组织设计方案进行施工。 有安排。 在完成施工组织的设计和施工图并提交监理工程师批准后,必须进行重要的处理。 充分利用有利条件和适当季节,合理安排施工计划,并在实施该工艺之前报请监理工程师批准,缩短施工流程,加快工程进度,确保工期。 同时,定期检查施工进度表的执行情况,并及时纠正施工进度表,以便
  4. In strict accordance with the construction progress of the network plan during the construction period, and in combination with various technical measures, the construction progress is carefully worked out, the construction organization and leadership are strengthened, and the construction is carried out in strict accordance with the approved construction organization design scheme. Arrangements are made. After completing the design and construction drawings of the construction organization and submitting them to the supervision engineer for approval, important treatment must be carried out. Make full use of favorable conditions and appropriate season, arrange construction plan rationally, and submit to supervisory engineer for approval before implementing the technology, shorten the construction process, speed up the progress of the project and ensure the construction period. At the same time, regularly check the implementation of the construction schedule, and timely correct the construction schedule in order to
  施工时间表始终可用于指导生产。 关键线的关键过程在有条件许可和质量保证的前提下,采用两个班次以加快施工进度并确保合同期的实现。
  Construction schedule can always be used to guide production. On the premise of conditional permission and quality assurance, two shifts are used to speed up the construction progress and ensure the realization of the contract period.